MS rears its ugly head again

Back in 2014 when I was dealing with SIBO and my feet started going numb we were a bit worried about MS and my doctor sent me off to a neurologist to see what was going on.   At that time it turned out I had neuropathy probably caused by the antibiotics.   In 2015 we found I had myelin antibodies from the autoimmune panel from Cyrex and so I had to go in for another neurological check and an MRI.  That MRI came back clean in the spring of 2015 and so I sort of figured I was out of the woods on this one.

Fast forward to last fall.  I started having frequent burning sensations in the front of my left leg and assumed it was due to the bad discs in my neck which were found in the MRI.  I went to a chiro and did my usual routine on the discs but the burning pain didn’t really go away and slowly got more frequent to where it was a daily occurrence.  My new naturopath looked at my MRI and thought I had not only bad discs but also a thickening of the ligament that runs along the spinal cord.  So, back to the neurologist for me with hopes that this was a structural issue that could be handled by surgery.

Continue reading

Elkless in Oregon

This year I didn’t really  get any good draws so have decided to do a muzzleloader mule deer buck hunt in late September and to try for a cow elk in the early season in Oregon to see if I could fill the freezer in August and take the pressure off of getting a buck.  With that in mind I headed down to John Day in smoke filled skies with temps in the mid-90s on the last day of July to go elk hunting on the opener with Broken Horn Outfitters.   After a six hour drive I arrived in John Day, got unpacked at the hotel and talked to the guides to set up a meeting time for early the next morning.  I roamed around town a bit and saw a bunch of quail and a few deer, my hopes were up.

Continue reading

I have a boat!

The completed boat ready to roll

A few weeks ago I got working on the boat exterior and that took a bit of time even though I was at it daily.   Multiple layers of epoxy with 24 hour dry times then priming, drying, two coats of enamel with 24 hours in between, etc…  Finally on the 19th I had a painted and dry boat so got it off the platform and onto the ground to install the seat, hatch cover, oar locks and handles.   I got all that installed on the 20th and loaded the boat up for a test float on our local lake with Lira in tow.  Luckily Catherine got home from work just in time to join me and take some photos and video of the maiden voyage.

Continue reading

Working on the boat exterior

Rails varnished and interior painted

It has been a while since I posted boat progress and I’ve made a lot of it in the last month, so much that I’m feeling the launch day is getting close finally.   I’ve been working on it almost daily except for a three-day break to go turkey hunting and one day to go swing flies on the Skagit, one must have priorities.   Trout season opened last weekend so this week I’ve been out in my float tube wishing that I had the boat ready to roll but I think it is possible I’ll be done in about 15 days if I can keep to schedule from here on out.  The big news is that the interior is done!  Well, I still need to put in oar locks, the seat and the hatch but really the interior is done for the most part.

Continue reading

Turkey Season 2018

My first big Tom

Last season I did my first ever turkey hunt over at the Double Barrel Ranch in Rockford, WA and got totally hooked.   This season I had planned a trip with a friend to go back and also do some bird hunting but between Lira going into heat and a changed commitment with my friend I needed to figure out Plan B.  I’d also pulled a muscle or tendon in my shoulder a week before so tried to change the dates but couldn’t so taped up my shoulder and hoped for the best. Since I’d already paid a deposit for two hunters at Double Barrel I decided to go on my own but instead of hunting the ranch we opted to hunt the Cheney area on some private ranches but I also got to find some public land in the area that holds turkeys as well as mule deer and elk.

Continue reading

Seams taped, rails on and misc work ongoing

I gave the jump-stitching plenty of time to dry since I had to go to Iowa for 10 days.  When I returned home I got busy on the boat first removing the bolts and cutting the wires to be sure it all stayed together.  Next I did the fillets for a day and let that dry for two days before light sanding and the taping of the inside seams which I then also let that dry a few more days.   Today I finally got the rails on the boat and opted for a simplified rail system of just inner and outer rail with no spacers.   I’ve also cut out the motor mount re-inforcements and some brackets for a bench seat should I decide to go that direction.   All in all a very busy week of boat building.

I’ll finish up the rails tomorrow, start sanding the corners of them and get the inside corners and the few small gaps filled with EZ-Fillet material.  Then I need to build some corners, do a good sanding job on the interior and rails, add another coat of epoxy on the interior seams and finally finish up the seat whichever route I decide to go.   With any luck I’ll have the interior wrapped up next week and can flip the boat over to start finishing up the exterior seams and put the bottom fiberglass on.  Time to order the last of my hardware and paint soon.   Trout season is only three weeks away but I’ll be turkey hunting the first weekend of it.  With any luck I’ll have a boat ready in early May to launch and start fishing from.

It looks like a boat!

In the last 10 days I went from a pile of wood to something that actually looks like a boat.  After getting the panels all lofted, cut out and marked up I began putting it all together.    I first wired in the two side panels in an afternoon, spent the next day cutting and preparing the bow and transom panels and then an afternoon wiring those in.   I then spent an afternoon getting in more bolts and wires to just make sure it was coming together well and another afternoon ripping my mahogany into strips for the rails.   By the time this was all done I had what looked like a hull.

Continue reading

Ready to start assembly

Panels beveled, marked and drilled for assembly

It has been a busy four days since I picked up my wood last Friday.  Over the weekend I managed to get the plans lofted and luckily caught and fixed my lofting mistake.  Yesterday I cut out the sides and bottom panels with my new pullsaw and went to pickup epoxy supplies at SystemThree.   Today I have beveled the edges of the panels, marked them up for drilling and fiberglass tape and got holes drilled on the bottom panel for wires.   This afternoon I am going to a friend’s house to use their table saw and cut rails.   So, I’m ready to roll on assembly tomorrow which is video #5 in the series of 30-odd videos on building this boat.    Hoping to get the sides wired onto the bottom tomorrow so I can loft out and cut the transom and bow pieces and then get those prepped and wired in on Thursday.   Within a week I’ll have gone from a stack of wood to something resembling a boat hull.   Hopefully by then it will have warmed up enough that I can start with epoxy work.

Measure twice (no three or four times) before you cut

Oops, a few mistakes but I caught it early and fiberglass will cover these extra holes anyway

I’ve spent the weekend lofting my plans onto the panels for the bottom and sides of the boat and finally have everything marked off and ready to cut.   This process involved making 1′ station lines across the boards then plotting points on offsets either from the bottom of the panel for the sides or the center line for the bottom.   The corners were a bit tricky on the sides since they involved offsets from the bottom as well as the side (transom) or the last 7′ line (bow).  I went through and re-measured all the offsets on the station lines  on both panels to make sure they were golden.  After I got the lines drawn in for the sides I started on the bottom.    With the bottom lines in and looking good I measured the arc length of the bottom, 89 3/4″ on both sides, perfect.   Then I measured the arc length on the side panel which should have been 90″.  Nope, it was 87 5/8″, what the heck?

So, I spent a half hour going back over all the measurements and found I had not double checked the bow and transom points on the side, my transom was fine but the bow was off – I had measured the horizontal offset wrong and had to move things to the correct spot, re-measured the arc length and had to move it just a smidge more to get it right.  Whew, glad I didn’t start cutting before triple checking all these measurements and making sure to check arc lengths.

Now onto cutting these panels and then starting to stitch them together before lofting and cutting out the transom and bow panels.  At this rate I should have something resembling a hull later in the week.

I’m gonna build me a boat with these two hands…

After last season at the lakes I decided that I wanted a boat so I could take Lira out fishing with me and keep from being so cold in my float tube.   I spent a lot of time looking at my options – a used jon boat, a small plastic boat or a wooden fly fishing pram.   I finally decided that a pram was the way to go and that instead of buying one I’d just try to build it on my own.  I haven’t built a boat before but have been in a homemade boat before and years ago read up on the whole process and now have the time to go for it.

The boat I’m building is called the Nymph 8 and was designed by Warren  Messer of Red Barn Boats.  I like the looks of this little pram, it appears it will fit in the back of the Tacoma no problem and there is an entire video series on YouTube where Warren builds the hull so I’ve got not only plans and instructions but videos to show me exactly what to do.

I downloaded the study plans and model, watched about half the videos then got the full plans and instructions last week and began planning out the project.  This week I picked up the materials to build the work platform and just ordered all the epoxy products from local SystemThree as well as the few tools I need still.  I will pick up the wood from Crosscut Hardwoods in Seattle in the next week and then can get building.   I’ll post regularly so you can follow along with the project.   Hopefully I can have the boat ready to launch around the time of the Western Lowland Lakes opener at the end of April.